In a Nutshell
This mattress topper is made with Coolmax fabric that draws moisture away from the body, allowing it to remain cool through the night
Product Details
The Deal
$49 for a single size Coolmax bamboo mattress topper (Don’t pay $179)
$59 for a king single size Coolmax bamboo mattress topper (Don’t pay $189)
$69 for double size Coolmax bamboo mattress topper (Don’t pay $199)
$79 for queen size Coolmax bamboo mattress topper (Don’t pay $219)
$89 for king size Coolmax bamboo mattress topper (Don’t pay $239)
Highlights
- Coolmax fabric that absorbs moisture
- Polyester top
- Polyester and cotton skirt
- Filling: Coolmax Mattress Topper Filling: 30% Bamboo / 70% Polyester Top: Coolmax Skirt: Polyester
- 40cm wall
- Machine washable
Size | Width | Length |
---|---|---|
Single | 91cm | 188cm |
King single | 110cm | 203cm |
Double | 137cm | 188cm |
Queen | 153cm | 203cm |
King | 183cm | 203cm |
The Fine Print
• Variable postage & handling fee on checkout
• Limit of 5 vouchers per option
• No refunds for change of mind
• No delivery to PO Boxes
• Price compared to www.luxor
How to Redeem
• Buy your Groupon
• Ensure you enter the correct address at checkout on Groupon
• A valid phone number is required to assist with delivery
• No need for further action or redemption after checkout
Shipping Information
• Fully tracked shipping - to track the status of your order click Track Package on the My Groupons section of your account
• Estimated delivery for Sydney/Melbourne/Brisbane metro customers is 2-5 business days
• Nationwide maximum delivery time is 14 days
• For more on shipping, see the FAQ
Please Note: While we will do our best to get your order to you in a timely fashion, items ordered after the below dates cannot be guaranteed for delivery before Christmas due to the increased pressure on delivery companies at this time of year.
Metro VIC / NSW / ACT / QLD / SA - Orders placed after Sunday 15th December 2019
All other locations - Orders placed after Tuesday 10th December 2019
Orders placed for the above locations after these dates, up until Mon 6th Jan 2020, may be delayed by up to 14 days.